| |
|
Entry Date
|
Nick Name
|
Location
|
|
Tuesday, April 07, 2009
|
|
North Shore Boyz
|
Mill Bay, British Columbia
|
|
Entry 12 of 142 |
|
|
|
|
Here is a shot of the adjustable rear attachment. After the first pass, I lowered it all the way down which was about 5" lower than the tines of the tiller....wow...what a differance it made.
I'm pleased with the soil report and have added K-Mag, granular humic acid, gypsum and kelp meal as advised with the last passing of the tiller.
Now the hoophouse will get put up and start warming the soil.
|
|
|