|
|
|
Select Destination
|
Site Search
|
|
|
|
|
|
Grower Diaries
|
|
Entry Date
|
Nick Name
|
Location
|
Friday, January 06, 2012
|
|
Dandytown
|
Nottingham, UK
|
|
Entry 1 of 165 |
|
|
|
|
Patch Prep for 2012 continues. Outlined in blue is patch one for the 852 Myers. This patch was dug over Sept/Oct 2011 and a load of manure (not aged) was spread over and turned in followed by a thick sowing of grazing rye. Didn't manage to get it all sown though before it was too late to sow.
|
|
|
|
|
Top of Page
Questions or comments? Send mail to Ken AT bigpumpkins.com.
Copyright © 1999-2025 BigPumpkins.com. All rights reserved.
|