Drip Tape Main Line (Header Line) Preparations for Structure Plant Site
Even though it has been a very wet spring, this will likely change as the season progresses, so to be proactive the drip irrigation main line is being assembled. This main line is for the structure grown plant and each emitter has an on/off valve for precise regulation of each drip line to allow for better control over the entire plant irrigation. Being able to water the newer and older growth portions of the plant differently, will provide the opportunity to ensure the proper amount of water is fed with the intention of maximizing production and efficiency.
|
|
|